Projects

Our work, start to finish.

Six recent projects, photographed by us on site: a stucco custom home over a basement, a family home on a crawl space, a 3,885 sq ft boarding house with its foundation and framing rebuilt, a block garage turned into a two-bedroom home, a new ADU from the staked lot up, and a 1937 home taken to the studs.

Custom home · under construction

Iron Station custom home

Front of the white stucco custom home with arched entry and black fascia Rear covered deck with pergola Home framed and sheathed Poured concrete foundation walls View through the arched front porch Finished stucco on the front elevation
Location
Iron Station, NC
Project
New construction, custom home
Main level
2,192 sq ft
Layout
3 bedrooms, 3 bathrooms
Garage
555 sq ft, two-car
Outdoor
317 sq ft deck, 72 sq ft covered porch
Foundation
Poured concrete walk-out basement

A custom home, photographed as it goes up

A California-style plan built in Iron Station: three bedrooms and three bathrooms in 2,192 square feet on the main level, over a full walk-out basement, with an arched front entry, a 555-square-foot two-car garage, a covered porch and a 317-square-foot rear deck under a pergola. Poured concrete foundation walls carry a steel beam across the basement; the main floor is framed on engineered I-joists, sheathed in ZIP System panels, and finished in three-coat stucco with black fascia and black windows.

The exterior is complete and interior finish work is under way. Finished interior photos will be added when the home is done.

Scope

  • FoundationPoured concrete walk-out basement, waterproofed, with a steel beam carrying the main floor
  • StructureEngineered I-joist floor system, framed walls and roof, ZIP System sheathing
  • RoofHip roof with architectural shingles and black fascia
  • ExteriorThree-coat stucco, arched entry, double front door, two-car garage, covered deck with pergola

Custom home, stage by stage

From foundation walls to finished stucco. Tap any photo to open it and step through the sequence.

  1. Foundation and basement

    Poured concrete walls, waterproofed below grade, with a steel beam set across the basement to carry the main floor. The garage slab is poured alongside.

  2. Framing

    Floor system on engineered I-joists, walls and roof framed, then ZIP System sheathing, which is the structural panel and the weather barrier in one. The arched entry and the arched interior openings are framed by hand, and the living room ceiling is vaulted with a see-through fireplace at its center.

  3. Roof

    Hip roof sheathed, underlayment down, and architectural shingles laid with the ridge and hips capped.

  4. Dried in

    Windows and exterior doors set, the weather barrier sealed, and the house closed up so interior work can start.

  5. Stucco

    Three coats: scratch, brown and finish, hand-applied over the whole exterior. Black fascia, black windows and the wood porch ceiling finish it.

  6. Interior finish

    Under way now. Kitchen, baths, floors, trim and paint. Photos will be added when the home is complete.

    Finished interior photos coming
New construction · under way

Taylorsville home

Front of the Taylorsville home with dormers, brick porch columns and attached garage Bonus room over the garage with dormer windows Block crawl space walls going up Home framed and wrapped Bathroom with double vanity and subway tile New concrete driveway to the garage
Location
Taylorsville, NC
Project
New construction
Size
1,724 sq ft
Layout
3 bedrooms plus bonus room, 2.5 baths
Garage
400 sq ft, attached
Foundation
Block crawl space

A family home on open land

A story-and-a-half home with dormers, brick porch columns and an attached garage, built on a block crawl space on a rural lot in Taylorsville. Three bedrooms and two and a half baths on the plan, plus a bonus room over the garage with dormer windows and a vaulted ceiling.

Taylorsville is outside our usual counties. We took the job because it was a good project with a good client, and we photographed it at every stage like the rest.

Scope

  • Site workLot cleared, graded and cut for the foundation
  • FoundationFootings poured, block crawl space walls, waterproofed below grade
  • StructureFramed walls and roof with dormers, house wrap, vinyl siding, brick porch columns
  • FinishHardwood-look floors, tile baths with a double vanity, stair with wood treads, concrete driveway

Taylorsville, stage by stage

From the excavator to the finished bonus room. Tap any photo to open it.

  1. Site work

    The lot is cleared, the pad graded, and the foundation footprint cut to grade.

  2. Footings

    Trenches dug to solid ground, rebar set, footings inspected and poured.

  3. Crawl space

    Block walls laid on the footings and waterproofed below grade, with piers for the floor girders.

  4. Framing and dry-in

    Walls, roof and dormers framed, house wrap on, roof shingled, windows set.

  5. Exterior finish

    Vinyl siding, brick porch columns, garage door, and a concrete driveway poured to the road.

  6. Interior finish

    Floors, trim, paint, tile baths, the stair, and the bonus room over the garage. Final touches under way.

Renovation · structural

Albemarle boarding house

The renovated boarding house with new siding, roof and porch Interior taken to the studs with new framing New block pier and girder beside the original brick pier in the crawl space Exterior with new house wrap and windows The boarding house before the renovation Rebuilt front porch with new railing and steps New ceiling and roof framing
Location
Albemarle, NC
Project
Full renovation of a boarding house
Size
3,885 sq ft
Layout
7 bedrooms, 3.5 bathrooms
Foundation
Crawl space, piers and girders repaired
Status
Nearly complete

Structural repair first, then everything else

A 3,885-square-foot boarding house with seven bedrooms, and the kind of problems an old building hides: a crawl space with failing brick piers and sagging girders, and framing that had been cut, notched and patched for decades. The job started underneath. New block piers were set beside the originals, new girders installed, and the floor system brought back to level before any finish work began.

Above the floor, the interior was taken to the studs, new framing sistered to the old where it could be saved and replaced where it couldn't, then new windows, siding, roof and a rebuilt porch outside and a full interior inside. The house is nearly complete; final interior photos are coming.

Scope

  • Foundation repairNew block piers and girders in the crawl space, floor system releveled, vapor barrier
  • StructureInterior gutted to the studs, framing repaired and replaced, new ceiling and roof framing where needed
  • Envelope and porchNew windows and French doors, house wrap, porch rebuilt with new deck, columns and railing, gravel parking area
  • Systems and finishElectrical, plumbing and HVAC rough-ins, insulation, drywall and full interior finish

Before and after

The same house, a year of work apart. Tap either photo to see it large.

Exterior: yellow siding and a collapsed porch, then new lap siding, roof, windows and a rebuilt porch.

Porch: brick columns and no railing, then a new deck, columns and railing on the original base.

Interior: bare studs and debris, then a finished kitchen with granite counters.

Under the floor and inside the walls

What we found, and the structural work most clients never see. Tap any photo to open it.

  1. As we found it

    A century-old boarding house, stripped to beadboard and bare studs, with debris in every room, a porch roof open to the sky, floor joists gone in places and a crawl space full of brick rubble.

  2. Foundation repair

    Failing brick piers were supplemented with new block piers on new footings, and new girders set to carry the floor. The crawl space got a vapor barrier.

  3. Framing repair

    Walls opened to the studs. Rotten and cut framing replaced, new studs sistered to the old, temporary bracing while load paths were rebuilt, new ceiling and roof framing where the original had failed.

  4. Porch and site

    The porch rebuilt on the original brick base with a new deck, columns and railing, new French doors, and the lot graded with a gravel parking area for seven bedrooms' worth of cars.

  5. Nearly finished

    New siding, roof, windows and porch outside; kitchen in with granite counters and stainless appliances. Final interior photos will be added when the last rooms are done.

Garage conversion · ADU

Belmont garage to home

Finished converted garage with gray board-and-batten siding Finished kitchen with quartz island and pendant lights The block garage before the conversion Tile shower with glass door French doors and gravel patio at the entry Open living area and kitchen
Location
Belmont, NC
Project
Garage converted to an ADU
Size
900 sq ft
Layout
2 bedrooms, 1 bathroom
Kept
Block walls and slab
Status
Complete

From a block garage to a 900 sq ft home

A detached block garage with a lean-to carport, a sagging door and open trusses. The owners wanted a second home on the lot, not a new building. We kept the block walls and the slab, and rebuilt everything else: new slab plumbing, framed walls inside the block, a full set of rough-ins, insulation, house wrap and board-and-batten siding, new windows and French doors, and a complete interior.

It's now a two-bedroom, one-bath home with a full kitchen, a tile shower and its own laundry.

Scope

  • DemolitionCarport, old door and interior removed; block walls and slab kept
  • SystemsPlumbing cut into the slab, electrical, HVAC and plumbing rough-ins, insulation
  • Structure and exteriorWalls framed inside the block, new windows and French doors, house wrap, board-and-batten siding, gravel patio
  • InteriorFull kitchen with quartz counters and island, tile shower, two bedrooms with closets, laundry, floors, paint and trim

Before and after

Same building, same spot. Tap either photo to see it large.

Front: block garage with carport, then board-and-batten siding, new windows and a gravel drive.

Inside: open trusses and bare block, then a full kitchen with a quartz island.

Entry: the carport became the main entrance with French doors and a gravel patio.

How it got there

The steps between the two photos.

  1. Demolition

    Carport, door and everything inside removed. The block walls and slab were sound, so they stayed.

  2. Slab plumbing

    The slab was cut and new drain and supply lines run for the kitchen, bath and laundry, then patched.

  3. Framing and rough-ins

    Stud walls framed inside the block to carry insulation, wiring and plumbing. Electrical, plumbing and HVAC roughed in and inspected, then insulation.

  4. Wrap and siding

    House wrap over the sheathing, new windows set, then board-and-batten siding and trim.

  5. Finished

    Kitchen, bath, bedrooms, laundry and the exterior complete.

New construction

Mint Hill ADU

Front of the finished ADU with board-and-batten siding and covered porch Finished kitchen with white shaker cabinets, granite island and pendant lights Poured concrete slab with plumbing stub-ups Framed interior with insulation and the front door set Finished bedroom with ceiling fan and new flooring Side of the ADU with porch columns
Location
Mint Hill, NC
Project
New construction, detached ADU
Size
900 sq ft
Layout
2 bedrooms, 2 full baths
Foundation
Monolithic slab
Roof
Stick-built, hand-cut rafters

A complete second home in the backyard

An accessory dwelling unit is a small house on the same lot as the main one. This one went up behind an existing home in Mint Hill: 900 square feet, two bedrooms, two full baths, a full kitchen with an island, and a covered front porch. It works as a home for family, a rental, or both.

We photographed it at every stage, so you can see exactly how a J&I home goes together, from the first stakes in the ground to the last cabinet door.

Scope

  • Site and foundationLot surveyed and staked, footings formed and poured, vapor barrier, monolithic slab with plumbing stubbed in
  • StructureFramed walls, stick-built roof with hand-cut rafters, board-and-batten siding, covered porch with columns
  • SystemsElectrical, plumbing and HVAC rough-ins, insulation, inspections at each stage
  • FinishDrywall, paint, flooring, doors and trim, white shaker kitchen with granite island, two full baths

Built from the ground up

The Mint Hill build in order. Tap any photo to open it and step through the whole sequence.

  1. Lot and layout

    The site is cleared, surveyed and staked. The building corners and the slab elevation are set before anything is dug.

  2. Footings

    Trenches are dug around the perimeter, forms set and leveled, and the footings inspected before the pour.

  3. Slab

    Plumbing is stubbed in, a vapor barrier goes down over the pad, and the monolithic slab is poured and finished.

  4. Framing, roof and siding

    Walls framed and a stick-built roof with hand-cut rafters, then house wrap, board-and-batten siding, windows, exterior doors and the porch columns.

  5. Rough-ins and insulation

    Electrical, plumbing and HVAC run through the framing, the shower units set, then insulation. Each trade is inspected before the walls close.

  6. Drywall and cabinets

    Drywall hung and finished, paint, then floors protected while doors, trim and the kitchen cabinets go in.

  7. Finished

    Kitchen with granite island and pendant lights, two full baths, two bedrooms, new flooring throughout.

Full remodel

The Landis remodel

Front of the remodeled Landis home with arched porch and new walkway Kitchen island with granite top and seating Open living and dining room Full bath with tiled walk-in shower Porch arches and new windows Primary bedroom Deck looking over the fenced yard
Location
Landis, NC (Rowan County)
Built
1937
Project
Full remodel
Size
About 1,550 sq ft
Layout
3 bedrooms, 3 bathrooms, open concept
Lot
Fenced corner lot

What we did

The house had good bones and a 1937 floor plan: small closed-off rooms and one and a half baths. We took the interior to the studs, moved and removed walls to open the kitchen, dining and living areas into one space, and rebuilt it as a three-bedroom, three-bath home. The brick and the arched porch that give the house its character stayed.

Everything inside is new: floors, kitchen, bathrooms, doors, trim, paint and lighting. Outside, the brick was painted, the windows and front door replaced, and a new deck and privacy fence added.

Scope

  • ExteriorBrick painted, new black windows, new front door, porch refinished, new walkway
  • OutdoorNew rear deck, vinyl privacy fence, gravel drive
  • LayoutWalls modified and removed for an open-concept kitchen, dining and living area
  • InteriorNew flooring throughout, interior doors, trim, paint and lighting
  • KitchenWhite shaker cabinets, granite counters, island, tile backsplash, stainless appliances
  • BathroomsThree full bathrooms, up from one and a half, with tile showers, new vanities and fixtures
  • BedroomsThree bedrooms with new closet systems and laundry connections

Walk through the finished home

Tap any photo to open it, then use the arrows (or swipe) to move room to room through the house.

Exterior

Painted brick, new black windows, a new front door, and the arched porch brought back to life.

Living and dining

An open living and dining space with new flooring, trim and lighting throughout.

Kitchen

White shaker cabinets, granite counters, a working island and stainless appliances.

Bathrooms

Marble-look tile showers, new vanities, fixtures and lighting.

Bedrooms and closets

Three bedrooms with new floors, doors, trim and closet systems.

Deck and yard

A new rear deck, privacy fence and a fenced corner lot.

Before and after

Landis before photos coming.

Nothing shows what a remodel does like the house as it was bought. Before photos and a walk-through video of the Landis home will be added here.

Walk-through video of the finished home goes here

Tell us what you want to build.

Spec home, custom build, investment property or remodel: you will get a straight answer on what it takes and what it costs, from the person who will build it.